LIGENTrobot delivers robot bodies for robotic welding projects, along with turnkey solutions encompassing robotic welding, manufacturing, installation, and commissioning. We also provide training for personnel and post-sales maintenance services.
Welding workpieces are shown in the figure below:

The project process flow is as follows:
1. Manual loading onto the workpiece positioning fixture
2. Welding robot performs front-side welding
3. After front-side welding completes, dual-sided flipping grippers secure the workpiece while simultaneously rotating it;
4. After flipping, the robot directly welds the reverse side;
5. Upon welding completion, the robot moves to weld another workpiece at a different station while the previously welded workpiece slides out. Manual removal and reloading of the workpiece occurs;
6. The above sequence repeats in alternating cycles.

Project After-Sales and Pre-Sales Services:
1. Warranty Period:
The warranty period shall be 12 months from the date of final project acceptance. During this period, if the robot malfunctions due to quality issues, the Supplier shall provide timely repair services and necessary replacement parts free of charge.
2. Warranty Coverage:
During the warranty period, the Supplier shall repair free of charge any malfunction or damage occurring during normal operation of the robot modules. However, the warranty does not cover losses or damage resulting from non-manufacturing quality issues such as improper operation, unauthorized disassembly, or modification by the Client, nor damage to the equipment's appearance or internal components caused by prolonged storage. The Client shall bear the related repair costs for such cases. After the warranty period expires, both parties shall adhere to the warranty agreement stipulated in the contract. Should Party A fail to fulfill the warranty terms in the contract, Party B shall still provide free online services and technical guidance. Party B shall offer timely spare parts supply to Party A at preferential prices. When Party B dispatches personnel for on-site repairs, corresponding travel expenses, labor costs, etc., shall be charged according to the Supplier's standards.
3. Emergency Response:
Guided by the principle of prioritizing customer needs, the Supplier commits to responding within 2 hours of receiving notification from the Purchaser. When on-site personnel are required, the Supplier's technical service engineer based at the regional technical service center shall be responsible for ensuring service personnel arrive at the site within 4 hours to resolve the issue.